This project, a new five-story, 180,000 SF Heart Hospital and Cancer Institute addition to Saint Francis Hospital, was completed in three phases with a 40 month completion date from start to finish. Phase 1 consisted of a 500 car parking ramp and mechanical and electrical design services. Phase 2 consisted of the building itself and Phase 3 consisted of interior remodeling of the existing equipment rooms.

The existing East Wing—Second Floor was remodeled to facilitate the addition of a new Endovascular Suite, Staff Locker Rooms and a future Endovascular Suite. The First Floor addition consisted of Linear Accelerator, CT/PET Scan, Hot Lab, Chemo and IV Prep Lab, Pharmacy with robot distribution system, Entry-Reception and spaces for future expansion. The Second Floor Addition consisted of Cath Labs, Pre-Post Procedure Rooms, and a CICU wing of rooms. The Third Floor addition consisted of typical Patient Rooms and Patient Isolation Rooms. The Fourth Floor addition This floor consisted of Oncology Treatment Rooms and future expansion spaces.