Bid Date: Wednesday, September 28 @ 2 PM

This project consists of replacing the main air handling equipment and associated heating and cooling units at the Lewis and Clark Interpretive Center in Washburn, ND to include (to be demoed) 11 Heat Pumps, 5 furnaces and 4 blower coils and associated head end equipment. Much of the existing ductwork will be reused; the new system includes 4 Air Handler Units with hot water coils and chilled water coils supplied by 3 gas fired boiler, an air cooled chiller, and 5 pumps. Zone control will be provided by 15 Variable Air Volume boxes and coils.

Invitation to Bid

Plan Holders List

Addendum 1